WORK
Traffic on the Muides-sur-Loire bridge will be interrupted from May 12 to May 25, 2025.
Bicycles, pedestrians and vehicles will not be able to cross the bridge during the entire construction period.
Loop n°12 and the Gare de Mer =>Chambord link will be closed.
Loire à Vélo cyclists will have to stay on the north bank.